Completed: Spring 2014
Millennium Square car park is a familiar place to many Bristolians. A previous winner of the ‘Park Mark®’ Award for its spacious and well-lit design makes it an interesting candidate for lighting project. The management team at @Bristol were keen to progress the lighting even further to a more sustainable and lower maintenance solution without any compromise to the lighting levels or aesthetics.
Connected Light have a relationship with @Bristol that goes back many years supplying replacement lamps for their facilities. We were happy to get involved with this project to help the client achieve their objectives.
To make additional savings on an initial outlay of purchasing and installing new fittings we suggested a retrofit solution. We worked with Taison Lighting to produce a retrofit LED tray and bespoke diffuser to fit the existing body of the current light fittings. Having collaborated with Taison several times before we were confident their skills in creating bespoke products would be ideal for this project.
A prototype was designed to work on the current wiring and convert the fittings all over to LED. This not only increased the lifetime of the fittings but also, due to the degrading of the previous metal halide technology, reduced heat and dramatically improved the colour rendering and colour temperature within the car park.
The project proceeded with over 600 fittings being converted over to Taison’s product. This resulted in a reduction of annual maintenance costs down to zero and an estimated annual energy savings of over £75,000 p/a. This equated to a payback on investment within 18 months giving @Bristol the only 100% LED lit car park in the South West of England and helped them hit all of their objectives for sustainability.

I've been a Client of Connected Light when working as a Project Manager for two NHS Trusts in Bristol over the past three years. Every interaction with Matt and the wider team at the company is a positive one... Read More

As a member of BS 5266 I am so excited to see such suitable, diligent, compliant processing from Connected Light. BS 5266 pt. 1 is a Code of practice for the emergency lighting of premises.... Read More

Connectedlight have worked for ETS designing and supplying lighting systems that deliver full turnkey projects repeatedly building up a valued trust between the companies.... Read More

I've been a Client of Connected Light when working as a Project Manager for two NHS Trusts in Bristol over the past three years. Every interaction with Matt and the wider team at the company is a positive one, and everyone I have dealt with has been excellent at explaining legislation, the possibilities with various lighting fixtures and designs. Fee proposals are very reasonable, well presented and complete and Connected Light deliver on what is defined at the outset.
Competence, particularly certified competence, is of paramount importance on the fire safety projects we are working on together, so Connected Light's expertise and accreditations are not only invaluable but also a necessity.
Thank you Connected Light for being a crucial part of our projects and assisting in making our hospital buildings safer, compliant and nicer places to be.

As a member of BS 5266 I am so excited to see such suitable, diligent, compliant processing from Connected Light. BS 5266 pt. 1 is a Code of practice for the emergency lighting of premises. This is the base document that calls up relevant standards and outlines how they should be interfaced. It also details how types of emergency lighting systems should be designed, installed, commissioned, and tested for different types of premises. Installation and wiring considerations are detailed and the appropriate testing and commissioning documentation are defined.
Connected Light as a member of the Fire Industry Association and competent compliance with BAFE SP203 part 4 adheres to appropriate verification for suitable compliance with all of their customers.

Connectedlight have worked for ETS designing and supplying lighting systems that deliver full turnkey projects repeatedly building up a valued trust between the companies. We have also been employed by Connectedlight upgrading lighting systems in many schools across the South.
Connectedlight engineers attention to detail is of a very high standing understanding the clients brief and looking at ways of energy saving and cost-effective installation. We have worked with various other lighting design companies, but Connectedlight definitely stand out in this area.
Their engineers and staff are professional, polite and keep you informed with updates on design and deliveries and will do whatever is required to succeed.
Their working accreditations reflect their quality of service and attention to detail. Construction Line Gold is a highly commended accreditation and requires a specific level of commitment, especially on health and safety and communicating between all parties involved. ETS Group have this accreditation and understands its level of difficulty to acquire.
Working with Connected Light Lighting Architects is a pleasure.



