Casambi nodes
6,000+
Energy saving
60%+
Floors upgraded
10

Connected Light worked directly with the City of London Corporation to review lighting energy use across several of its buildings, surveying the sites and proposing where LED lighting and new controls could reduce consumption.

Vital Energi was appointed to deliver the schemes, and Connected Light supported the work from concept to completion over 10 months. More than 6,000 Casambi nodes were installed, and the upgrade achieved energy savings of over 60%.

At Guildhall, the retrofit covered two areas with different requirements. The North Wing offices needed an upgrade that fitted within the existing service rafts. In the Great Hall, the listed light fittings had to be retained.

Working within the North Wing service rafts

The service rafts across all 10 floors had to stay in place. Their angled light apertures housed Cat 2 louvres and T5 fluorescent lamps, and the position and angle of those apertures set the limits for the replacement equipment. The T5 lighting was removed and Connected Light developed the new office lighting design around the existing openings. A new fabricated MPO optical diffuser replaced the Cat 2 louvres, giving UGR19 anti-glare control within the angled aperture.

Fabricating the slot-in LED trays

Connected Light’s fabrication team designed and made the new LED gear trays in-house. Each tray was fully packed with new technology and was made to slot into the space left by the old fluorescent equipment.

The trays incorporated Casambi DALI dimming and integrated wireless emergency lighting using Surepath, so each one went into the raft as a complete unit.

Setting up the North Wing lighting controls

A micro Casambi sensor was used in certain luminaires which activates the office lighting in groups, so it responds in the part of the office being used. The wireless lighting control system is also set up for daylight regulation, reducing LED output when there is enough natural light.

Timed scenes provide a separate lighting arrangement for night-time security.

Retaining the listed Great Hall fittings

The Great Hall’s listed fittings could not be replaced, so the heritage lighting design focused on the equipment inside them. Connected Light developed new direct and indirect retrofit gear cartridges to replace the old metal halide and halogen equipment.

The new cartridges were designed to work with the original Lutron controls, so the hall kept both its listed fittings and its existing control system. It is a practical example of modern performance in lighting for historic buildings.

Commissioning and out-of-hours work

Connected Light provided commissioning throughout the project, including out-of-hours site attendance, installation and programming.